TRABZON ÇARŞIBAŞI DRAINAGE CONSTRUCTION

Owner : Drainage Department, General Directorate of the Provincial Bank of Turkey
Name of Project : Çarşıbaşı ( Trabzon) Drainage Construction
Location : Trabzon/Turkey
Line Total : 28.000m
Contract Date : 06.12.2000
Completion Date : 02.07.2009
Scope of Project : Construction work including network, collectors and collector lines and related inspection shafts,property shafts and links, elevation lines, elevation stations, annexed facilities and 8 septic tanks (fosses septics)

A technical team working for the Drainage Department and the 17th Regional Directorate of the General Directorate of the Provincial Bank of Turkey studied and reported the actual drainage and rainwater requirements of Trabzon’s Çarşıbaşı District in Eastern Black Sea Region. Projects were designed on the basis of this report. In line with the provisions of the approved version of the report, a comprehensive construction work was carried out to meet the infrastructure requirements of the district. Related work included the construction of a network, collectors and collector lines and related inspection shafts, property/parcel shafts and links, elevation lines, elevation stations, annexed facilities and 8 septic tanks as well as related excavation, filling and concrete works.

Works:

• Ø200, laying of steam-cured concrete pipes with integrated sealing (14.800m)
• Ø300, laying of steam-cured concrete pipes with integrated sealing (5.350m)
• Ø400, laying of steam-cured concrete pipes with integrated sealing (2.200m)
• Ø800, laying of steam-cured concrete pipes with integrated sealing (3.000m – for rainwater)
• Ø1200, laying of steam-cured concrete pipes with integrated sealing (2.650m – for rainwater)
• Construction of 1.100 inspection shafts
• 2.000 property/parcel connections