ilcitaban4

KRALKIZI DİCLE CAZİBE IRRIGATION 3. SECTION MAIN CHANNEL REINFORCEMENT

Owner : State Hydraulic Works (DSİ) of Republic of Turkey, 10th Regional Directorate
Name of Project : Kralkızı-Dicle Cazibe Irrıgation 3. Section Main Channel Reinforcement
Location : Diyarbakır / Türkiye
Contract Date : 10.05.2012
Completion Date : 232 Days
Scope : Maintanence Road Construction, Excavation and Filling, Carcass and Pipe Laying.

Kralkızı-Dicle Cazibe Irrıgation 3. Section Main Channel Reinforcement is built for State Hydraulic Works (DSİ) of Republic of Turkey, controlled by State Hydraulic Works (DSİ) of Republic of Turkey, 10th Regional Directorate, located on Dicle River/Diyarbakır.